Case Study

HIGHLAND ESTATE BRIDGE

HIGHLAND ESTATE BRIDGE

Pages 1 Pages

CASE STUDY Office Address: McGowan Ltd, Unit 16, Dalfaber Industrial Estate, Aviemore PH22 1ST Telephone: 01479 812170 // Email: info@mcgowanltd.co.uk www.mcgowanltd.co.uk LocaTon: Highland Estate Type of works: Estate Bridge ConstrucTon Contract Value: £77,000 Project entailed the ini/al removal of the exis/ng bridge and old concrete abutments. The new concrete bridge abutments and wing walls were formed before 4nr galvanised steel beams 7.34 metres in length being installed with traverse equal angle steel braces to provide the main bridge support structure. Hardwood /mber wa

Join for free to read