EvoEnergy with DSP Construction Management installed a 2.1 MWp solar PV system on the rooftop of Aldi’s new regional distribution centre in Bolton
EvoEnergy with DSP Construction Management installed a 2.1 MWp solar PV system on the rooftop of Aldi’s new regional distribution centre in Bolton
Aldi Distribution Centre In 2015, EvoEnergy won the tender with building contractor, DSP Construction Management, to install a 2.1 MWp solar PV system on the rooftop of Aldi’s new regional distribution centre in Bolton, cutting the supermarket’s carbon footprint by almost 1,000 tonnes every year. The 8,240-panel system was designed and installed by EvoEnergy using Renesola 255W solar panels, each connected to Fronius inverter technology in a purpose built room within the facility. It took a ten-man team around eight weeks to complete and required careful coordination between installers, electricians and construction contractors on site. The solar panels were installed with an east/west split to spread the generation throughout the day; this arrangement also allowed more panels to be i