EvoEnergy were invited to tender for the work to install a 1.5MWp array on the next Aldi distribution site to be built in Cardiff

EvoEnergy were invited to tender for the work to install a 1.5MWp array on the next Aldi distribution site to be built in Cardiff

Pages 2 Pages

Aldi Distribution Centre After recently completing the 2.1 MWp solar PV installation on Aldi’s distribution centre in Bolton, EvoEnergy were invited to tender for the work to install a 1.5 MWp array on the next distribution site to be built in Cardi?. Demonstrating once again exceptional ability, design and innovation – that also helped win the Bolton project – EvoEnergy were awarded the work by DSP Construction Management (the contractors building the new site) with work starting in January 2016 for completion in April. EvoEnergy proposed that the array would be subsidised through the Renewables Obligation (RO) scheme instead of the feed-in tari? as it attracted a bigger income and gave the client a better rate of return. However, in December 2015 the Government con?rmed that RO su

Join for free to read