Case Study
Evaluation Of Spillway Tunnel For Hydropower Generation Usage
PROJECT PROFILE Planned hydropower development at the Flannagan Dam in Haysi, Virginia involved permanent flooding of the ex- isting open-channel spillway tunnel under a hydraulic head of more than 200 feet. To evaluate the effects of pressurizing the 16-foot-diameter tun- nel, D’Appolonia was retained to deter- mine the condition of the surrounding rock and concrete tunnel liner. D’Appolonia planned and conducted an extensive in-sit