PROJECT PROFILE The Piedra del Aguila Hydroelectric Project is a 1,400-MW facility located in the south of Argentina, on the Limay River approximately 250 kilometers from Bariloche. The dam is of concrete- gravity construction, and it is 860 me- ters long, averaging 170 meters in height above its foundation. The power plant is located at the toe of the dam and has four Francis Runner turbines. The project does not include fish pas- sag