Europaviertel network connection - Wiesbaden, Germany

Europaviertel network connection - Wiesbaden, Germany

PI1781en / 9126751 / 10-18 / 1.000 Project Z Network connection for the Hainerberg/Europaviertel/BMHKW districts Z Operator: ESWE heating plant, Hainerberg/Europaviertel Performance parameter Hainerberg Z Output: 26 MW Z Temperature: 105 °C / 85 °C Z System pressure: 5.5 bar Europaviertel Z Output: 19.9 MW Z Temperature: 105 °C / 60 °C Z System pressure: 8.5 bar Biomass heating plant (BMHKW) Z Output: 10,500 MW Z Temperature: 120 °C / 65 °C Z System pressure: 4.5 bar Task Z Expansion of the existing plants to include intelligent control modules and the development of an interconnected mode for the three Hainerberg, Europaviertel and BMHKW networks. Z The sought-after solution was a PLC control that can be implemented within the existing process visualisations. Produc