Case Study
Etex
The Challenge ETEX Building Performance Ltd, a construction materials company opened its Bristol plant in 1990, to manufacture drywall products and systems for partitions, ceilings, wall linings and external sheathing purposes. With well over 20 successful years of operation fulfilled, the compressor equipment, which included HPC ASD, BSB and CSB compressors, was ready to be replaced. Based on previous very positive experience, ETEX’s