Case Study
ESeal HP Liner Reclaims Woodford Shale Well - Saves $8MM Investment
Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2014 Enventure Global Technology Enventure and SET are trademarks of Enventure Global Technology All Rights Reserved. Ver01 02/15 PERFORMANCE ESeal TM HP Liner Reclaims Woodford Shale Well - Saves $8MM Investment Challenge A major Mid-Continent Operator faced having to abandon a well due to perforations prematurely shot in a horizontal well’s build section (heel). The Operator needed a solution that could not only cover four sets of perforations in order to resume the fracturing program, but also withstand the 12,500 psi fracture pressures—all while maintaining the ID needed for 5-1/2 in. frac plugs to pass through.