Case Study
Erosion Control on Flood Defence Works
Case Study Contact ABG t 01484 852096 e geo@abgltd.com www.abgltd.com The Greatham flood alleviation scheme comprises the raising of and improvements to existing flood defences originally constructed in the mid to late 1800’s by the formation of embankments and bunds. The works include the construction of a new embankment alongside the A178. The embankments are 2.5m high with 1 in 3.5m to 1 in 4m side slopes dependent on ground conditions.