Case Study
EPX50 Bridge Deck Overlay: SH-4A Over Shoshone River
EPX50 Bridge Deck Overlay | Project Profile PROJECT CONCERNS This project required a large reserve of resin on the pump truck due to the scale of the bridge. E-Chem provided enough material to complete over 2,000 SY in a single shift without reloading. The contractor was able to install an average of 10,000 sf/hr. with the pump shown and a crew of 6 installers. This bridge was completed in two single shift days allowing the contractor to com