EPX50 Bridge Deck Overlay: 1-40 Port of Entry

EPX50 Bridge Deck Overlay: 1-40 Port of Entry

Pages 1 Pages

EPX50 Bridge Deck Overlay | Project Profile PROJECT CONCERNS This project was time critical on I-40. The installation needed to be completed in a single daytime shift. E-Chem provided a 2:1 spray pump to apply the EP100 sealer in tandem with a 1:1 epoxy overlay pump for the EPX50. The sealer and overlay was installed in a single pass allowing the contractor to complete the sealer application and two lifts of overlay in a 10 hour sh