EoN Bulk Terminal
Case Study: EoN Bulk Terminal EoN Liverpool Bulk Terminal chose Hydramist high pressure watermist equipment to cover the transfer towers and the conveyor belts at their site on the River Mersey. Flame detectors were also added as part of the detection with specialised nozzles being used to protect the conveyors from the risk of fires. Requirements: A zonal Hydramist High Pressure Requirements: A zonal Hydramist High Pressure Watermist System Watermist System Why Hydramist was chosen: Why Hydramist was chosen: EoN Liverpool Bulk TerminalFast and e ective control and suppression of re Minimum water is used to suppress the re Expertly installed onto the new conveyors Professionally installed on site Rapid project completion time & accessibly positioned within the Conveyors Fabrication can b