Case Study

Environmental Improvements, Leicestershire Highway Works Alliance

Environmental Improvements, Leicestershire Highway Works Alliance

Pages 2 Pages

Environmental Improvements, Leicestershire Highway Works Alliance Maintenance free recycled plastic fencing erected on time and to budget 3915/0715 ©2015 Tarmac Trading Limited. THE CHALLENGE Narborough Road South, through Braunstone town, is a busy dual carriageway and one of the busiest routes into Leicester. Running parallel to each side of the main carriageway are two directional service roads separated by a narrow verge area. Working alongside Leicestershire Highways Officers (LHO) we managed the removal of 3km of wire mesh metal fencing that was positioned in both narrow verge areas and replaced with aesthetically pleasing low maintenance fencing. OUR SOLUTION Working together with LCC to agree the design criteria and it was con- cluded that the fencing should meet

Join for free to read