Case Study #25 Voltage Power Optimisation With such a packed schedule of events, making infrastructure improvements at the Barbican can be a logistical challenge. Having installed powerPerfector units in over 4,500 buildings in the UK, our team has a deep understanding of what our clients expect during installation, in order to minimise disruption to their operations. Because a powerPerfector installation requires an electrical shutdown, we arrange the vast majority of installations at the most convenient time for the client. At hotels, for instance, that’s usually between morning check-out and afternoon check-in, for a 24 hour supermarket we’ll shut the site down in the early hours of Sunday morning, before it reopens for trading. For acute hospitals, we’ll arrange