Case Study

Enabling Field Production in the Eagle Ford Yielding a 700% Increase

Enabling Field Production in the Eagle Ford Yielding a 700% Increase

Pages 1 Pages

Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2016 Enventure Global Technology. Enventure and ESeal are trademarks of Enventure Global Technology. All Rights Reserved. Ver 01 01/15. PERFORMANCE Enabling Field Production in the Eagle Ford Yielding a 700% Increase Challenge The Operator needed to isolate zones and provide a high- pressure environment for an aggressive re-fracturing program. Conserving hole size was important, along with providing an economical, reliable process. Conventional cement squeezes had limited success and proved costly. Scab liners reduced the inside diameter and prevented pumping at the desired fracture rates. Results and Value Added • Ave

Join for free to read