Case Study
Emergency Back-Up Power for Entire Hospital Campus
JDRM The project involved design for a total onsite emergency back-up for the hospital campus back feeding a 34.5 kV system in need of additional and reliable emergency power. Replacement of the two existing generators with two new 1000 kVA generators and new 34.5 kV electrical service, provided the Emergency Back-Up Power for Entire Hospital Campus Reliable emergency back-up power is paramount for hospitals as they must continue providing services even in the most extreme situations. JDRM Engineering's designers developed an extensive system that will continue to flow in emergencies and create solutions for ongoing operations that nearby neighborhoods appreciate every day.campus with power to meet current and future needs. Electrical design included a 480V – 34.5 kV step up transformer