Case Study

Electricity from waste heat cuts operating costs

Electricity from waste heat cuts operating costs

Pages 2 Pages

Member of Güntner Group Güntner GmbH & Co. KG Hans-Güntner-Straße 2 – 6 82256 FÜRSTENFELDBRUCK GERMANY www.guentner.eu Overview Business line: Energy & Process Application: Mining Country/Region: UK / Thrislington Fluid: R-245fa Product: Güntner air-cooled V-SHAPE Vario GVD condenser Electricity from waste heat cuts operating costs For the first time, the Heatcatcher system for generating electricity from waste heat was integrated in a lime plant. The £1.3 million ‚was- te heat to power‘ system installed by Heatcatcher Ltd generates an estimated net power of around 3,000 MWh a year from the waste heat of the lime kiln via an ORC process (Organic Rankine Cycle). High efficiency condensers supplied by Güntner, a global leader in the manufacturing of heat exchangers, contribute to th

Join for free to read