Case Study
Efficient Engineering Change Processes using SAP® PLM7 and 4PEP
© ILC GmbH 2015. All rights reserved. The material contained in this document is for information purposes only and is not binding. Phone +49 (0)6826 189-0 Fax +49 (0)6826 189-189 E-Mail: info@ilc-solutions.net www.ilc-solutions.net ILC GmbH Saarpfalz-Park 7 66450 Bexbach “We chose ILC as our consulting and implementing partner in order to be able to achieve our project goals faster and more effectively. The PLM7 extension based on the reliable 4 PEP platform was the only way for us to realize the necessary functionality.” Gerard Engelkamp, Dipl. Ing. Director of IT and Organization Since 1950, the name Hottinger Baldwin Messtechnik (HBM) has stood for excellence in test and measurement worldwide. HBM’s precise and robust sensors, data acquisition systems and s