Case Study

EDF – SKID

EDF – SKID

T H E P R O B L E M How to clean the plate heat exchangers which, supplied by a source of cold water upstream from the power station (such as a river or the sea), cool the water in a nuclear power station's cooling system? How can obstructions (sediment, algae, shellfish etc.) be dealt with as quickly and effectively as possible? At ABMI, we responded to this challenge by completely redesigning the maintenance solution, moving from a mechanical m

Join for free to read