VSH XPress EDF Energy Sizewell B Power Station Sizewell B is the UK’s only Pressurised Water Reactor and also the most modern nuclear power station in the UK. Project Profile The site has recently (2017) been taken off-grid to allow for a £60 million maintenance programme. It was during this time that the connections to the HVAC system situated atop the roof of the Welfare Building were to be replaced. Due to the nature of the site a solution was required to install larger sized pipework without the use of heat. In addition, the site is situated close to the coast so corrosion was also a notable factor when choosing the correct piping system. VSH XPress integrated piping system was specified for the replacement of the 2 x CHUs and 1 x AHU. The installation of the VSH XPress pipi