Case Study
East Riding Council
Project Title: Bridlington CCTV control room relocation Client: East Riding Council Sector: Security Completion: August 2018 Project Overview: The existing CCTV control room was to be relocated into a new room within East Riding council offi ces in Bridlington. After its refurbishment, Thinking Space provided two curved control room consoles, both being height adjustable and positioned to give the appearance of one long console. These are centred around a curved media wall spanning 8 metres in length. With privacy screening to hide essential equipment, it creates a calming working environment for viewing CCTV footage and keeping the area safe. Overview CCTV Control Room Relocation New CCTV control room at East Riding Council Case Study Overview of client East