Case Study
EAST ANGLIA ONE OWF - PHASES 1 & 2 FRONDED CONCRETE MATTRESSES (FCM’S)
EAST ANGLIA ONE OWF - PHASES 1 & 2 FRONDED CONCRETE MATTRESSES (FCM’S) “Innovative, proven and bespoke solutions” CASE STUDY Official supplier to East Anglia ONE 3 DESIGN BRIEF Pipeshield International Limited were awarded PHASE ONE in October 2018. The port of mobilisation was Great Yarmouth so to optimise costs Pipeshield mobilised equipment and personnel to an area within the port itself and set up a temporary manufacturing site. We were set up and manufacturing within 5 working days of project award. Manufacture of all FCM’s was completed ahead of schedule and Pipeshield assisted DeepOcean to loadout over three mobilisations over the Christmas period of 2018. All Bi-flex mattresses supplied were Pipeshield’s patented N2 edge block design for extra stability and the three part