Case Study
Doha South
INTRODUCTION: Doha South Sewage Treatment Works, Phase IV —Qatar Design and construction of an additional treatment system, modification to the existing works and improvements to the sludge treatment stream to meet the flows and loads expected by the year 2013. The average flow to be accommodated is 1,230 lit./sec., with a weekly peak of 2,212 lit./ sec. And a maximum pumping capacity of 4,241 lit./sec. The loads to be accomm