Case Study

PORR Group (Doha Metro)

PORR Group (Doha Metro)

Pages 2 Pages

World Leaders in Sustainable Change © Renoir Consulting Limited. This document remains the property of Renoir Consulting Limited and must not be copied or distributed in hardcopy or electronic form without the prior written approval of Renoir Consulting Limited. Key Results 13.5% reduction in cost per unit produced realized during the duration of project Total of 20.7% efficiency improvement identified and agreed to be implemented in the

Join for free to read