Case Study
Diablo Canyon Power Plant: Circulating Water Intake - California
Year of Completion: 1995 Construction Cost: $17M Client: PG&E Services Performed: • Analysis and Design • Cost Estimating • Specification Pr eparation • Constructability Studies • Corr osion Assessment • Cathodic Pr otection Structural repair of the circulating water conduit. Ben C. Gerwick, Inc. 05-098e_9124 Gerwick was asked to assist in establishing and implementing a repair/protection program to guard against continuing reinf