Case Study

Marina Replacement Design - Crescent City, California

Marina Replacement Design - Crescent City, California

Pages 1 Pages

Marina Replacement Design Crescent City, California Year of Completion: 2011 Client: Stover Engineering for Crescent City Harbor District Ben C. Gerwick, Inc. 09-290e In 2006, a tsunami, originating from a magnitude 8.3 subsea earthquake, impacted Crescent City and caused $9.2M of damage to the marina. Gerwick was retained to provide the detailed planning, as well as the structural and coastal engineering design required for rehabilitat

Join for free to read