Case Study
Detroit, MI Client: Great Lakes Water Authority
Detroit, MI Client: Great Lakes Water Authority Commencement of Operations: Fall 2015 Capacity: 420 dry tons per day Contact Info: 313.551.5278 Address: 9125 W. Jefferson Avenue Detroit, MI 48209 The Great Lakes Water Authority (GLWA) awarded a contract to NEFCO to design, build, and operate a biosolids processing facility to augment the processing capacity of GLWA ’s wastewater treatment plant. The facility features technologically advanced air pollution, noise, and odor control systems to ensure that NEFCO is a good neighbor to the community. Benefits from this contract include significant cost savings over the current biosolids management practice, capital cost savings by NEFCO providing dewatering at a significant cost reduction versus a centrifuge capital project that was planned, m