Case Study

Detailed Design Of A Temperature Controlled Warehouse

Detailed Design Of A Temperature Controlled Warehouse

Greenside Way, Middleton, Manchester M24 1SW T: +44 (0)161 655 3344 F: +44 (0)161 655 3399 W: www.besltd.org Part of the Boulting Group Ltd DESIGN CASE STUDY NO 6 Validated Warehouse Facility ? Concept Design ? Planning and Building Control ? Utility Consultation ? Validation Support Detailed design of a temperature controlled Warehouse, including Cold Rooms and Administrative support areas for a glo

Join for free to read