Design and construction of a 1,316m² steel fibre reinforced concrete (SFRC) ‘jointless’ internal ground floor slab suspended on piles. Poole Borough Council considers the upgrade of the waste transfer station and civic amenity site as an integral part of the waste infrastructure for Poole as the works will secure the future of its waste management strategy. The finished facility will support the Council’s objective of protecting Poole’s environ