Case Study

Design And Construction Of 41,900m2 Steel Fibre Reinforced Concrete (SFRC) Ground Floor Slab

Design And Construction Of 41,900m2 Steel Fibre Reinforced Concrete (SFRC) Ground Floor Slab

Pages 2 Pages

Design and construction of 41,900m 2 Steel Fibre Reinforced Concrete (SFRC) Ground Floor Slab. Shoprite in association with main contractor Steffanuti Stocks chose to work with T wintec South Africa, part of the T wintec International Group of Companies, to design and install a steel fibre reinforced concrete (SFRC) jointless ground bearing floor slab for their new distribution centre in Brackenfell, South Africa. Design: T wintec design methods

Join for free to read