Case Study
DDCS SALM
Scope of Work SOFEC designed, constructed, and supervised installation of a SALM to operate in ice-laden water to import fuel, diesel and Mogas. General Description Client Name: Danish Defense Construction Service (DDCS) Contract Award: 1982 Installation Date: 1983 Application: Jet Fuel, Diesel and Mogas Import Project Specifications Water Depth: 15m (50ft) Tanker Size: 35,000 dwt Dimension: 9.2m x 4.0mØ Floating Hose System: 2