Case Study
Dauntsey’s School, West Lavington, Wiltshire
Background Cole Easdon Consultants (CEC) helped Dauntsey’s School in its redevelopment of former agricultural land to provide it with new parking areas, a pupil drop off/collection point for up to eight school coaches, a sports area for three football/rugby pitches, and a full size athletics track. CEC designed a new drainage system to separate foul and stormwater drainage and improve stormwater drainage. The cost of the works was around £1 million. Client Dauntsey’s School CEC Input CEC provided: § Full engineering design § Project management § Contract administration § Site supervision § CDM coordination Case Study Dauntsey’s School, West Lavington, Wiltshire Photograph is the property of Cole Easdon Consultants The project involved the full engineering design of the new facilities, incl