The Solution The approved programme involved the fit out and installation of communications services including: 120 cabinets; power rails and in-line meters; 16 SYSTIMAX Visipatch 360 distribution frames; a high level basket tray to support the copper cabling; high level Panduit fibre runner to support the fibre trunks; copper and fibre distribution systems; 8,000 SYSTIMAX Cat 6A copper panel-to-panel links; 750 SYSTIMAX Cat 6a copper harness links; 250 x 12 Core OM4 fibre trunks; 25 x 12 core OS1 fibre trunks; voice distribution; communications outlets located in the Level 1 oce space; and iPatch database build and implementation. Implementation With the project requiring completion within a very tight installation period, implementation was based on a 24 x 7 working p