Case Study

Dark fibre and flexible-working strategy at the heart of Dundee Council’s £270m flagship waterfront development project.

Dark fibre and flexible-working strategy at the heart of Dundee Council’s £270m flagship waterfront development project.

Pages 2 Pages

www.cityfibre.com Dark fibre and flexible-working strategy at the heart of Dundee Council’s £270m flagship waterfront development project. Overview As part of the £270m reinvigoration of Dundee, the ‘Dundee Waterfront’ vision is to transform, energise and connect the city to the waterfront. Dundee Council’s ailing tower block headquarters stood in the way of the new waterfront development and therefore needed to be relocated closer to the city centre. The Council had two existing data centres, one of which would need to be moved to the new premises at Dundee House and linked back to the other. Challenge The Council required a fibre link between its new headquarters and the other existing data centre in Shore Terrace. It required a fully diverse solution providing separate