Case Study
Dairy Producer Transitions Lactose Crystallization Tanks Without Downtime
Dairy Producer Transitions Lactose Crystallization Tanks Without Downtime MA VERICK transitions a new building of lactose crystallization tanks with zero process downtime. Objective The customer needed to program and commission a new building containing a significant array of lactose crystallization tanks. The existing crystallization system was scheduled for removal and the customer required the new system be commissioned with minimum production impact. Results The MAVERICK team carefully planned a multi-tiered transition between the old and new systems, incrementally passing handshaking and control of clean-in-place (CIP) and production systems while the process was active. The dynamic process change to the new equipment was successfully implemented with no production downtim