Case Study

Cutting the cost of energy and maintenance at Blackpool Victoria Hospital

Cutting the cost of energy and maintenance at Blackpool Victoria Hospital

Pages 2 Pages

CASE STUDY: Blackpool Victoria Hospital The acute hospital has upgraded the heating and hot water supply in ten plant rooms to Spirax Sarco’s EasiHeat™ steam-to-hot-water solutions. It has also installed a Spirax Sarco Reverse Osmosis (RO) system and has modernised the site’s steam trap population. The EasiHeat systems alone are forecast to save Blackpool Victoria Hospital more than £240,000 per annum (p.a.) in energy costs plus an additiona

Join for free to read