Case Study
Spirax Sarco plate heat exchanger packages deliver energy savings through precise control -Leighton Hospital
Spirax Sarco plate heat exchanger packages deliver energy savings through precise control -Leighton Hospital
Plate heat exchangers from Spirax Sarco are saving energy, reducing maintenance costs and improving the comfort of patients at Leighton Hospital in Crewe. With one running and the other on standby, the two 3MW exchangers use plant steam to heat water for space heating throughout the 700-bed hospital. The exchangers were supplied pre-assembled in frame-mounted packages complete with ancillary equipment such as steam traps. This modular ap