Case Study
Crawley, UK - Attenuation Tank
LOCATION Crawley CUSTOMER Willow Pumps / PDAS Attenuation Tank Case Study Requirements: Willow Pumps/PDAS required an interim measure to be installed during a construction phase the company is working on to prevent surface water from ? ooding the site. SEPTEMBER 2016 Design target To install a cost-effective solution that would guarantee peace of mind that no ? ooding would take place during the wet months of the construction phase. T