Case Study

Manchester Railway

Manchester Railway

LOCATION Hotel Development, Piccadilly Train Station, Manchester CUSTOMER Marshall Construction Attenuation Tank Case Study Problem Due to new works being carried out at the railway station on above ground level, the amount of drainage had increased and was ? owing down into a basement road below the railway station. The current system was unable to cope with the excess drainage and so a solution was required. Site Conditions Minimal spac

Join for free to read