Case Study
Covered With Confidence
Covered With Confidence Problem: The Antrim/Kalkaska County Landfill in northern Michigan was required to close. The combination of a sandy subgrade and climate extremes required a creative solution from the engineer. The landfill had to be sealed with a durable, weather resistant and impermeable cap. Cost and installation time were also factors in specifying an appropriate system. Solution: 20 mil PVC geomemb