Case Study
Corporation Nacional del Cobrede Chile (CODELCO) Leach - Pad - System
Leach-Pad-System Customer Plant Location Scope of work Corporation Nacional del Cobre de Chile (CODELCO) El Abra (Chile) Turn-key project 1 Project Figures Material: Leached copper ore Stacking: 9,500 t/h Reclaiming and disposal: 8,250 t/h Density of consolidate material after the leach period: 1.65 t/m³ Nominal capacity: 9,600 t/h approx. 6,400 m³/h Bulk density: min. 1.50 t/m³ Bucket Wheel Reclaimer Nominal reclaiming height: 5 m