Case Study

Corporation Nacional del Cobrede Chile (CODELCO) Leach - Pad - System

Corporation Nacional del Cobrede Chile (CODELCO) Leach - Pad - System

Pages 2 Pages

1 Leach-Pad-System Customer Plant Location Scope of work Corporation Nacional del Cobre de Chile (CODELCO) Radomiro Tomic (Chile) Turn-key project Project Figures Design capacity: 10,745 t/h Nominal capacity: 8,600 t/h Material: Copper ore Stacker feed conveyor Belt width: 1,600 m Belt speed: 6.1 m/s Belt length: 2,813 m Main drive power: 3 x 1,000 kW Bucket Wheel Reclaimer Theoretical conveying capacity: 10.745 t/h / 7,410 m³/h Bu

Join for free to read