Case Study
Corn Mill Farm, Hawkesworth, West Yorkshire • ICF enabled continuous construction through winter
NUDURA Project Profile 866-468-6299 www.nudura.com FAST FACTS Corn Mill Farm, Hawkesworth, West Y orkshire, England • Renovation for 300-year-old water-powered mill site • Extensive demolition and rebuilding with reclaimed stone • ICF enabled continuous construction through winter • Numerous waterproofing challenges PROJECT STATISTICS Location: Hawkesworth, West Y orkshire, England Type: Residential Size: 11,500 sq. ft. (floor) ICF Use: 8,640 sq. ft. Cost: $2.6 million Total Construction: 78 weeks ICF Installation Time: 80 days CONSTRUCTION TEAM Owner: Peter Hoban General Contractor: Landmarks (UK) Ltd. ICF Installer: Landmarks (UK) Ltd. Architect: Studio Map ICF System: NUDURA Inc.