Case Study

Coreflex, Greenscapes Provide Worry-Free Plaza Restoration.

Coreflex, Greenscapes Provide Worry-Free Plaza Restoration.

Pages 2 Pages

PROJECT CASE STUDY PROJECT CASE STUDY North America: 847.851.1800 | 800.527.9948 | www.CETCO.com COREfl Ex TM , GREEnSCAPES TM provide worry-free plaza restoration. As the final step of a two year restoration project, the owners of Sandpiper Run needed the elevated and vegetated access to the beach and pool waterproofed. It was important to them that this access be ready for use by Memorial Day and they insisted on a short construction schedu

Join for free to read