DAWSON CONTRACT PILING Harbour Motorway Rail Basement Sustainable Foundation Specialist Work > Balloch Field - North Sea (2013) COOLING SPOOL SKID DESIGN The Balloch field is located in block 15/20a and 15/20b in the North Sea and ties back to the existing DC2 manifold on the Dumbarton field which in turn ties back to the GP3 Floating Production, Storage and Offloading (FPSO) vessel. There are two potential drill sites, one approximately 100m away and the other 1.7km. Both options require the need for a cooling spool to ensure they have an arrival temperature of 80°C upon entering the DC2 Manifold. Maersk Oil North Sea (MONS) UK Limited have asked Xodus Group to conduct concept design work (and detailed design upon selection and approval) for the Balloch cooling ski