Case Study
Construction Of Two New Storm Detention Tanksleigh & Glazebury Waste Water Treatment Works
CONSTRUCTION OF TWO NEW STORM DETENTION TANKS LEIGH & GLAZEBURY WASTE WATER TREATMENT WORKS Construction of two new in-situ RC above ground detention tanks 42m di- ameter, 8m deep on major piled foundations. New in-situ RC CSO cham- ber with longwood screen, new in-situ RC inlet pipework & valve chamber, new control building, MEICA, new outfall structure to the river, open-cut sewers at 300 to 1200mm ID, new access road and site landscaping.