Case Study

Composting and Wood Waste Recycling Facility

Composting and Wood Waste Recycling Facility

Pages 1 Pages

Case Study>> Waste & Recycling>> Higher Brynn, St Austell, Cornwall Client>> Green Waste Company Project>> Composting and Wood Waste Recycling Facility The site is located in open countryside just off the old A30, which has now been by-passed by the recent re-alignment to provide a dual-carriageway and access roundabouts. The application submitted in December 2010 sought permission for the importation and processing of a total of 40,000 tonnes of waste each year, of which 10,000 tonnes would be wood waste, 10,000 tonnes of green waste and the balance food waste. The latter would be treated ‘in-vessel’ in composting tunnels alongside a dedicated food waste reception building. The green waste would be composted in an outside yard, in windrows, with wood waste being processed in an a

Join for free to read