Case Study
Comfort And Energy Improvements At A Powdered Beverage Manufacturing Site - Global consumer beverage manufacturer, India
Comfort And Energy Improvements At A Powdered Beverage Manufacturing Site - Global consumer beverage manufacturer, India
FOR FURTHER INFO T: +44 (0) 1625 660 717 E: info@eeco2.com eeco2.com COMFORT AND ENERGY IMPROVEMENTS AT A POWDERED BEVERAGE MANUFACTURING SITE CLIENT | LOCATION Global consumer beverage manufacturer, India SECTOR Food and beverage PROJECT BRIEF Our client was experiencing high HVAC energy demand driven by the original system design in order to meet product critical relative humidity conditions during summer months. Forecast energy cost rises of 17% per year were putting increased pressure on budgets. The brief was to reduce the dehumidification energy demand without compromising operator working conditions and product quality. RESULTS Rs 2.1m Energy cost savings (per year) 350 tonnes of CO 2 Emissions reduction (per year) 591,000 kWh Energy savings (per year) SOLUTION EECO2 wor