Case Study
Tablet Manufacturing Suite Heating, Ventilation And Air Conditioning System Upgrade - Global pharmaceutical manufacturer, South Africa
Tablet Manufacturing Suite Heating, Ventilation And Air Conditioning System Upgrade - Global pharmaceutical manufacturer, South Africa
FOR FURTHER INFO T: +44 (0) 1625 660 717 E: info@eeco2.com eeco2.com TABLET MANUFACTURING SUITE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM UPGRADE CLIENT | LOCATION Global pharmaceutical manufacturer, South Africa SECTOR Pharmaceutical manufacturing PROJECT BRIEF EECO2 was asked to assist in reducing energy demand at a tablet manufacturing facility without compromising product quality or regulatory compliance. Challenges included: • High volumes of fresh air requiring dehumidification in very challenging ambient conditions • Adapting the HVAC system to meet current manufacturing requirements • Reducing the volume of the dust extraction system and install VSD • Initiating no operational setbacks. RESULTS £36,000 Energy cost savings (per year) 336 tonnes of CO 2 Emissions