Case Study
Coal Producer’s Safety Concern With Underground Haulage System
CUSTOMER PROBLEM: Pennsylvania’s 3rd largest coal producer was replacing cable frequently on under- ground haulage systems due to failure from abrasion. Safety being a top priority, the customer needed a long-term solution that could be used in emergency shut- off situations. TPC SOLUTION: TPC suggested Super-Trex ® 16/6 Multi-Conductor P&R Cable, which features a specially compounded TSE jacket that provides superior first-line defense ag